Nokia 7250 Ixr X1 Installation Guide [verified] Jun 2026
srlinux$ system hash-password MySecret123
Follow the CLI prompt to configure the basic network settings (IP Address, Subnet Mask, Gateway). 7. Troubleshooting and Maintenance Power Indicators: Check that the PSU LEDs are solid green.
Attach the grounding lug to the chassis and connect the other end to the rack ground or facility grounding point. 4.3. Installing Power Supplies (PSU) nokia 7250 ixr x1 installation guide
Proper cable management is crucial for airflow and maintenance.
Once the system reboots, log in via the console (default credentials can be found in the Basic System Configuration Guide Attach the grounding lug to the chassis and
: Check the chassis and components for any shipping damage.
Use CAT6A or higher for 10GbE copper connections. Once the system reboots, log in via the
Strip the insulation on the DC power cables back approximately 1/2 inch.
Ensure that link LEDs are illuminated or blinking, indicating physical connectivity.